Please ensure that users are familiar with the complete User Manual before proceeding with the below Quick Start Guide.
1. Unpack and install the battery into the plant.
> Click here to access the full Unpacking and Installation guide
2. Connect the communication connector with the power supply to the Battery Management System (BMS) and telematics. #
> Click here to learn more about the BMS
> Click here to learn more bout the High Voltage Interlock Loop (HVIL)
> Click here to learn more about the Communication Connector
> Click here to learn more about the Cloud Device Connection (ODOS)
Additional information for parallel battery pack system architecture:
> Click here to learn more about the Parallel BMS Communication and Power Supply
> Click here to learn more about Parallel HVIL Connection
> Click here to learn more about Parallel High Voltage Harnessing
3. Perform “Wake Up” procedure #
> Click here to access the Communication guide
4. Connect the thermal management system #
> Click here to access the Thermal Management System Overview chapter
5. Connect the high-voltage connectors #
> Click here to access the High Voltage Connectors guide
6. Install Manual Service Disconnect (MSD) and fuse #
> Click here to access the MSD guide